  • "Improvement of Main Power System Protection Equipment Engineering of SSR Protection Panel for Generator shaft"
    [ENGINEERING - Electrical / Instrumentation and Control] "Improvement of Main Power System Protection Equipment Engineering of SSR Protection Panel for Generator shaft" 상세보기

    • Applying a lot of experience for improving the electrical protection system of NPPs. • 345kV Switchyard System Design & Engineering. Such as Electrical Equipment and Relay Protection . • Main Power System Protection Design & Engineering. Such as Generator, Transformer and Excitation System, GCB, GIB. etc,. • Design and engineering for SSR (Sub-synchronous Resonance) protection for the first time in Korea using PSCAD Program.

  • Improvement of NPPs Switchyard & Power Transmission Line
    [ENGINEERING - Electrical / Instrumentation and Control] Improvement of NPPs Switchyard & Power Transmission Line 상세보기

    • Design Change Report - Design of transmission tower and 345kV cables to connect the transmission lines of NPPs to the new switchyard. - Circuit design for control and protection of switchyard system. • Technical specifications, Bid evaluations and Vendor print reviews for protective relay panel

  • "Design Changes for the Nuclear Power Plants in Operation MSO Circuit Analysis for FHA"
    [ENGINEERING - Electrical / Instrumentation and Control] "Design Changes for the Nuclear Power Plants in Operation MSO Circuit Analysis for FHA" 상세보기

    • Preparation of 98 design changes of electrical, instrumentation and control design for the NPP in operation. - Electrical design : Electrical System Design, Electrical Equipment Design, Electrical Circuit Design, Electrical Physical Design. - I&C design : Control System Design, Installation Design, Human Factors Engineering Design. • Electric circuit analysis of MSO(Multiple Spurious Operation) for FHA of NPP in operation. • Certification of Completion - 2013 EPRI / NRC-RES, Fire Probabilistic Risk Assessment Session 2